<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Datacentr</title><description>Daily news and explainers on AI data centers: power, cooling, GPUs, modular builds, and the deals and grid limits behind them.</description><link>https://datacentr.ai/</link><item><title>How much power does an AI data center use? Racks, halls and campuses</title><link>https://datacentr.ai/news/ai-data-center-power-requirements/</link><guid isPermaLink="true">https://datacentr.ai/news/ai-data-center-power-requirements/</guid><description>Power numbers for AI racks (about 120 kW now, 600 kW planned), for sites in megawatts and gigawatts, and for the US and the world, with sources.</description><pubDate>Wed, 18 Nov 2026 00:00:00 GMT</pubDate><category>Power and grid</category><category>GPUs and chips</category><category>Buildouts and deals</category></item><item><title>FingerMotion and BlueFlare unveil a modular data center concept for extreme heat</title><link>https://datacentr.ai/news/blueflare-snap-modular-data-center/</link><guid isPermaLink="true">https://datacentr.ai/news/blueflare-snap-modular-data-center/</guid><description>BlueFlare Snap is a factory-built modular AI data center concept aimed first at the UAE. It is early-stage, and the companies&apos; merger is non-binding.</description><pubDate>Wed, 18 Nov 2026 00:00:00 GMT</pubDate><category>Modular data centers</category><category>Buildouts and deals</category></item><item><title>Loudoun County adopts a 12-month pause on data center approvals</title><link>https://datacentr.ai/news/loudoun-data-center-moratorium/</link><guid isPermaLink="true">https://datacentr.ai/news/loudoun-data-center-moratorium/</guid><description>Loudoun County, Virginia, the largest data center market in the world, voted 7-1 to pause board votes on new data center and substation applications for up to a year.</description><pubDate>Wed, 18 Nov 2026 00:00:00 GMT</pubDate><category>Policy and permits</category><category>Buildouts and deals</category></item><item><title>Texas resumes data center permits and approves SpaceX&apos;s Starbase air permit</title><link>https://datacentr.ai/news/texas-data-center-permits-resume/</link><guid isPermaLink="true">https://datacentr.ai/news/texas-data-center-permits-resume/</guid><description>Texas environmental regulators restarted data center permit reviews on 16 November after a pause, and issued a major air permit for SpaceX&apos;s $24 billion Starbase project.</description><pubDate>Wed, 18 Nov 2026 00:00:00 GMT</pubDate><category>Policy and permits</category><category>Buildouts and deals</category></item><item><title>US data center construction starts dipped in Q3, then picked up in October</title><link>https://datacentr.ai/news/us-data-center-construction-q3-2026/</link><guid isPermaLink="true">https://datacentr.ai/news/us-data-center-construction-q3-2026/</guid><description>Cleanview counted 8.4 GW of new US data center construction in Q3 2026, down from 11.2 GW in Q2, with 58 GW now under construction nationwide.</description><pubDate>Wed, 18 Nov 2026 00:00:00 GMT</pubDate><category>Buildouts and deals</category><category>Power and grid</category></item><item><title>What is a modular data center? A guide for AI workloads</title><link>https://datacentr.ai/news/what-is-a-modular-data-center/</link><guid isPermaLink="true">https://datacentr.ai/news/what-is-a-modular-data-center/</guid><description>A modular data center is built in factory-made blocks and assembled on site. This guide covers the types, sizes, cooling, speed claims and trade-offs for AI.</description><pubDate>Wed, 18 Nov 2026 00:00:00 GMT</pubDate><category>Modular data centers</category><category>Buildouts and deals</category><category>Cooling</category></item><item><title>Grid operators file large-load interconnection reforms at FERC</title><link>https://datacentr.ai/news/ferc-large-load-interconnection-filings/</link><guid isPermaLink="true">https://datacentr.ai/news/ferc-large-load-interconnection-filings/</guid><description>PJM, CAISO, MISO, NYISO and ISO-NE filed plans this month for connecting data centers to the grid, answering FERC&apos;s June show cause orders.</description><pubDate>Tue, 17 Nov 2026 00:00:00 GMT</pubDate><category>Power and grid</category><category>Policy and permits</category></item><item><title>Ecolab and CoolIT launch a 3 MW coolant distribution unit for AI racks</title><link>https://datacentr.ai/news/coolit-ecolab-3mw-cdu/</link><guid isPermaLink="true">https://datacentr.ai/news/coolit-ecolab-3mw-cdu/</guid><description>Ecolab&apos;s CoolIT CHx 3000 CDU is rated at 3 MW, runs on 45 C water, and ships from Q1 2027. It is aimed at racks of 190 kW and up.</description><pubDate>Mon, 16 Nov 2026 00:00:00 GMT</pubDate><category>Cooling</category><category>GPUs and chips</category></item><item><title>From Eliovp: Kimi-K3.1-Pro on 6 MI355X GPUs at 800 W with Paiton</title><link>https://datacentr.ai/news/eliovp-paiton-kimi-k31-pro-amd-instinct-mi355x/</link><guid isPermaLink="true">https://datacentr.ai/news/eliovp-paiton-kimi-k31-pro-amd-instinct-mi355x/</guid><description>Kimi-K3.1-Pro on six MI355X GPUs at 800 W each. Paiton throughput, power measurements, a separate 1M-context test and a four-GPU option.</description><pubDate>Wed, 11 Nov 2026 00:00:00 GMT</pubDate><category>GPUs and chips</category><category>Power and grid</category></item><item><title>From Eliovp: Nvidia confirms the modular DC direction</title><link>https://datacentr.ai/news/eliovp-nvidia-dsx-pod-vera-rubin-modular-data-centers/</link><guid isPermaLink="true">https://datacentr.ai/news/eliovp-nvidia-dsx-pod-vera-rubin-modular-data-centers/</guid><description>NVIDIA DSX POD brings Vera Rubin AI factories to modular data centers. ElioVP explains site readiness, cooling and the thinking behind ModFlex.</description><pubDate>Wed, 21 Oct 2026 00:00:00 GMT</pubDate><category>Modular data centers</category><category>Cooling</category><category>Power and grid</category></item><item><title>From Eliovp: AI Data Center Power Requirements: The GPU/MW Illusion</title><link>https://datacentr.ai/news/eliovp-ai-data-center-power-requirements-gpu-per-megawatt/</link><guid isPermaLink="true">https://datacentr.ai/news/eliovp-ai-data-center-power-requirements-gpu-per-megawatt/</guid><description>Why do AI data-center proposals quote different GPU capacities? See how PUE, peak loads, storage, networking and cooling determine deployable compute.</description><pubDate>Mon, 27 Jul 2026 00:00:00 GMT</pubDate><category>Power and grid</category><category>GPUs and chips</category></item><item><title>From Eliovp: ElioVP in De Tijd: Chip Optimization and Data Centers</title><link>https://datacentr.ai/news/eliovp-from-the-attic-to-the-front-page-eliovp-recognized-as-a-pioneer-in-chip-optimization-data-center-infrastructure/</link><guid isPermaLink="true">https://datacentr.ai/news/eliovp-from-the-attic-to-the-front-page-eliovp-recognized-as-a-pioneer-in-chip-optimization-data-center-infrastructure/</guid><description>Read about De Tijd&apos;s coverage of ElioVP, from its origins in chip optimization to its work on modular data centers and high-density cooling.</description><pubDate>Tue, 10 Feb 2026 00:00:00 GMT</pubDate><category>Modular data centers</category><category>Buildouts and deals</category></item><item><title>From Eliovp: NVIDIA GB300 NVL72: A Four-Month Modular Data Center Plan</title><link>https://datacentr.ai/news/eliovp-building-the-engine-for-the-ai-race-the-4-month-path-to-nvidia-gb300-nvl72-power/</link><guid isPermaLink="true">https://datacentr.ai/news/eliovp-building-the-engine-for-the-ai-race-the-4-month-path-to-nvidia-gb300-nvl72-power/</guid><description>Explore a modular data center design for NVIDIA GB300 NVL72, covering redundant power, hybrid cooling and a four-month deployment plan.</description><pubDate>Thu, 20 Nov 2025 00:00:00 GMT</pubDate><category>Modular data centers</category><category>Power and grid</category><category>Cooling</category></item><item><title>From Eliovp: ClusterP&amp;L: Financial Modeling for GPU Clusters</title><link>https://datacentr.ai/news/eliovp-clusterpl-empowering-gpu-cluster-investors-with-real-world-financial-insights/</link><guid isPermaLink="true">https://datacentr.ai/news/eliovp-clusterpl-empowering-gpu-cluster-investors-with-real-world-financial-insights/</guid><description>Explore how ClusterP&amp;L models GPU cluster costs, profitability and investment scenarios, with ROI metrics, risk simulations and exportable reports.</description><pubDate>Sat, 03 May 2025 00:00:00 GMT</pubDate><category>Buildouts and deals</category><category>GPUs and chips</category></item><item><title>From Eliovp: Modular Data Centers for NVIDIA NVL: 1 to 2 MW</title><link>https://datacentr.ai/news/eliovp-power-meets-precision-high-density-modular-data-center-for-nvidia-nvl-deployments-1-2-mw/</link><guid isPermaLink="true">https://datacentr.ai/news/eliovp-power-meets-precision-high-density-modular-data-center-for-nvidia-nvl-deployments-1-2-mw/</guid><description>Explore modular data center designs for NVIDIA NVL systems, covering power capacity, liquid cooling, redundancy and deployment planning.</description><pubDate>Fri, 02 May 2025 00:00:00 GMT</pubDate><category>Modular data centers</category><category>Power and grid</category><category>Cooling</category></item></channel></rss>